Company News 6 views

Spanish Automotive Client Audits Our Seat Wire Form Production

A Spanish automotive components buyer audited production capacity and quality control for seat wire forms at our Xuzhou factory on 18 November 2026.

Spanish Automotive Client Audits Our Seat Wire Form Production
In this article
  1. Key takeaways
  2. Why did the customer audit the factory after receiving our quote?
  3. What did the audit route cover?
  4. What capacity did the customer come to check?
  5. Stop 3: How do we control heat treatment on spring parts?
  6. Stop 4: What quality checks did the customer see in our testing room?
  7. Stop 5: Production buildings on the Xuzhou campus
  8. What did the customer say after the audit?
  9. What happens next?
  10. What should you check when you audit a wire form supplier?
  11. Planning an audit or a new wire form project?

On 18 November 2026, the business development director of a Spanish automotive components company audited our spring factory in Xuzhou, China. After receiving our quotation for car seat wire forms, he came to check 2 things: production capacity and quality control. Chairman Wu Chao and General Manager Feng Yulin hosted the visit.

ItemDetails
Date18 November 2026
PlaceNorenSpring factory, Xuzhou, Jiangsu Province, China
VisitorBusiness Development Director, Spanish automotive components company
HostsWu Chao (Chairman) and Feng Yulin (General Manager)
Parts discussedWire forms for car seats
Project stageQuotation sent; supplier evaluation under way
Audit focusProduction capacity and quality control
Agreed next stepCustomer to send order quality requirements and packaging requirements
The 18 November 2026 audit at a glance.

Key takeaways

  • Route: raw wire store, CNC coiling and wire forming, heat treatment furnace and tempering area, then the testing room.
  • Feedback: positive on capacity and quality control; he hopes to build a long-term strategic partnership with NorenSpring.
  • Next step: back in Spain, he will send order quality requirements and packaging requirements.
Welcome meeting with a Spanish automotive client at NorenSpring
Welcome meeting in the Xuzhou factory meeting room.

Why did the customer audit the factory after receiving our quote?

Wire forms are parts bent from spring wire into a set shape, such as clips, hooks, frames and seat suspension wires, rather than coiled into a helix. In a seat, they help hold the cushion and backrest shape and take load every time someone sits down.

A quote shows what a part will cost. It does not show whether the supplier can hold that price, quality and delivery at production volume, which is why automotive buyers usually audit a plant before approving it.

Spain shows why the bar is high. It is the second-largest vehicle producer in Europe, its plants built 2.27 million vehicles in 2025, and its auto supply industry accounts for 75% of a vehicle’s value, according to ICEX-Invest in Spain [3]. As a result, Spanish component makers answer to demanding vehicle plants, and they audit their own suppliers in turn. Across the EU, the European Commission counts 13.8 million direct and indirect automotive jobs, or 6.1% of total EU employment [4]. The same sources show how export-driven this supply chain is. Spain hosts 9 multinational vehicle brands with 18 plants, exports 86% of the vehicles it builds to more than 100 countries, and its spare parts industry invoiced €41.5 billion in 2025 [3]. At EU level, automotive turnover represents over 7% of EU GDP [4]. A seat wire is bent in several planes and loaded every time someone sits down, so small changes in wire, forming or heat treatment show up in fit and durability.

New to the part type? Our wire forms design guide covers bends, legs and tolerances.

What did the audit route cover?

The audit followed the material from incoming wire to the testing room in 5 stops.

StopWhat the customer looked atBuyer question it answers
1. Raw material storeIncoming spring wire coils and stainless wire spools, labelled by grade and sizeIs the wire identified and traceable to a material certificate?
2. CNC coiling and wire formingAutomatic coilers, a large CNC coiling machine and multi-axis CNC wire forming machinesIs there enough machine capacity, and are parts formed by program rather than by hand?
3. Heat treatmentThe spring heat treatment furnace and the tempering areaAre temperature and time controlled, and does hardness end up within the drawing?
4. Testing roomSpring tension and compression testers, a vision measuring system and a salt spray chamberCan dimensions, load and coating be checked in-house, with records?
5. Production buildingsThe walk between workshops on our Xuzhou campusIs the site a real, running plant with room for the program?
The five stops of the 18 November 2026 factory audit.

Stop 1: Raw material store

The audit started at the wire store, where traceability begins: the batch on a part label should lead back to its coil and that coil’s material certificate. NorenSpring staff showed how incoming coils are identified and recorded.

Spring wire coils in the raw material store
Stop 1: Incoming spring wire coils in the raw material store.

Stop 2: CNC coiling and wire forming lines

Seat wire forms are made on the multi-axis CNC wire forming machines. Each bend angle and leg length is set in the program, so every cycle repeats the same part. The customer also checked parts straight off the tooling at a discharge chute.

Walking through the CNC spring forming workshop
Stop 2: Walking the CNC forming lines.
Multi-axis CNC wire forming machine with formed wire parts
Stop 2: Multi-axis CNC wire forming machine and formed parts.
Visitor checking freshly formed parts at a CNC spring machine
Stop 2: Checking parts straight off a CNC spring machine.
Filmed during the visit: a multi-axis CNC wire forming machine bending wire parts in one continuous cycle (15 seconds).

Full step list: spring manufacturing process.

What capacity did the customer come to check?

These are the plant figures published on our About page.

Capacity itemNorenSpring, Xuzhou
Production area12,000 m² across our production base
Production lines3
Employees120+, including 28+ engineers
Monthly output4,000,000+ springs
Wire diameter range0.1 mm to 80 mm
CertificationsIATF 16949 (to 4 February 2028), ISO 9001, ISO 14001, ISO 45001
Published NorenSpring plant figures, November 2026.

Part-level capacity depends on forming cycle time, tooling, heat treatment batch size and inspection time, so we confirm it once annual volume is fixed.

Stop 3: How do we control heat treatment on spring parts?

At the spring heat treatment furnace, NorenSpring staff explained that we set furnace temperature and time strictly in line with Chinese national standards. Quenching and tempering is a 2-step heat treatment: the steel is hardened by heating and rapid cooling, then reheated to a lower temperature to trade some hardness for toughness. For parts that need it, it serves 3 purposes:

  1. Strength and elasticity. Quenching and tempering raise the strength of the steel so the part springs back instead of taking a set.
  2. Stress relief. Tempering removes internal stress left by coiling and bending, which helps prevent distortion and cracking.
  3. Stable hardness. The process brings hardness into the range on the drawing, for example 49–53 HRC. Holding that range is what gives a spring part its fatigue life under repeated loading.
Spring heat treatment furnace on the production line
Stop 3: Explaining furnace temperature and time settings.

After the furnace, parts pass through the tempering area, where operators handle and sort them before inspection. A buyer should expect hardness to be checked against the drawing after this step, not assumed from the furnace setting alone.

Tempering area of the spring production line
Stop 3: The tempering area.

Stop 4: What quality checks did the customer see in our testing room?

In the testing room, parts are checked against the drawing and control plan. For wire forms bent in several planes, the vision measuring system matters most.

Equipment (model series)What it checksRelevance to seat wire forms
Vision Measuring System (Keyence IM-8000 / IM-8030)Length, outside diameter, wire diameter, angles, shapeBend angles and leg lengths
Video Measuring System (OGP SmartScope ZIP / VMS-3020)2D dimensions, profiles, hole positionsOverall wire form profile
Spring Tension & Compression Tester (JISC PRO / Aikoh 1311NR)Load, spring rate, working heightLoad at the installed position
Rockwell Hardness Tester (Mitutoyo HR-530 / HR-150A)Material hardnessHardness against the drawing, e.g. 49–53 HRC
Salt Spray Tester (Q-Fog CCT1100 / NSS)Zinc, nickel, e-coat and anti-rust performanceCoated parts
Material Analyzer (Thermo Scientific Niton XL2 / OES)Chemical compositionConfirms the steel grade of incoming wire
Selected in-house testing equipment at NorenSpring, Xuzhou.
Quality inspector explaining a vision measuring system
Stop 4: Dimensional checks on the vision measuring system.
Spring load testing equipment in the in-house lab
Stop 4: Spring tension and compression testers.

IATF 16949 is the automotive quality management standard published by the International Automotive Task Force; in 2016 it replaced ISO/TS 16949 [1]. NorenSpring holds IATF 16949 certification, valid to 4 February 2028.

PPAP is the Production Part Approval Process, the automotive industry’s standard way to show that a supplier’s production parts consistently meet the design record and specification [2]. For automotive programs, we can prepare a PPAP package. Which PPAP level and which documents are needed is agreed with each customer at project setup. You can read more about how we accept or reject parts in our post on spring testing and acceptance.

Salt spray test chamber in the testing area
Stop 4: Salt spray test chamber.

Stop 5: Production buildings on the Xuzhou campus

The audit closed with a walk between the production buildings, which house our 3 production lines on a 12,000 m² production base.

Walking between production buildings at NorenSpring Xuzhou
Stop 5: Production buildings on the Xuzhou campus.

What did the customer say after the audit?

Back in the meeting room, the customer gave his feedback. He was positive about both NorenSpring’s production capacity and its quality control. He told us he hopes to build a long-term strategic partnership with NorenSpring.

However, we take that as encouragement, not as an order. Samples, quality planning and part approval still lie ahead.

What happens next?

After returning to Spain, the customer will send 2 sets of requirements. The quality requirements will set critical dimensions, hardness, load checks, finish, inspection frequency and shipping documents. The packaging requirements will set how parts are protected from tangling and scratching, how many go in each unit, and how each unit is labelled. Once both are agreed, we build them into the control plan and packing instruction. Our usual options are sealed bags for small parts, protected cartons for larger parts and plywood crates on pallets for heavy loads, each confirmed before production.

What should you check when you audit a wire form supplier?

For seat wire forms, or any spring part where fit and fatigue matter, an on-site audit tells you more than a quote. Based on this visit, here is a 7-point checklist for any spring factory, including ours:

  1. Material traceability. Pick a coil, ask for its material certificate, then trace a finished part’s label back to it.
  2. Forming method. Confirm your part runs on a CNC wire forming machine; CNC gives more consistent bends at volume.
  3. Heat treatment records. Ask how furnace temperature and time are recorded and how hardness is checked against the drawing.
  4. Measurement. Ask to see a bent profile measured on a vision measuring system or checking fixture.
  5. Load and corrosion testing. Confirm load testing and, for coated parts, salt spray testing are in-house.
  6. Automotive documentation. Ask for the IATF 16949 certificate and its expiry date [1], and agree early which PPAP documents you need [2].
  7. Packaging and labelling. Bring your packaging standard so it is confirmed before the first sample shipment.

Our guide on how to choose a spring manufacturer covers the questions to ask before an audit, and our automotive springs page lists the automotive spring types we make.

Planning an audit or a new wire form project?

If you are sourcing seat wire forms or other automotive springs, send us your drawing, annual volume and quality requirements. We will review manufacturability, quote the part and, if you wish, arrange a factory audit like this one. Contact NorenSpring to start.

What we need for a seat wire form quotation:

InputWhat to send
DrawingDWG, DXF, STEP or PDF, with critical dimensions marked
WireDiameter and grade, for example 65Mn, SWOSC-V or 50CrVA spring steel
HardnessRange on the drawing, for example 49–53 HRC
FinishZinc, phosphate, e-coat, powder coating or oiled
VolumeAnnual volume and expected batch size
Quality and packagingPPAP level, inspection plan and your packaging standard
Inputs for a seat wire form quotation.

COMMON QUESTIONS

Answers Before You Ask

Clear answers to common purchasing questions.

Still have questions?
Can you manufacture from my drawing without a standard part number?

Yes. Most of our projects start from a customer drawing or application sketch. We review the geometry, material and performance needs, then confirm manufacturability before quoting.

What is your minimum order quantity?

We support both small-batch prototypes and high-volume production. There is no fixed MOQ — quantities are evaluated based on the spring type, tooling and material requirements.

How do you handle springs for high-temperature or corrosive environments?

We select materials (such as Inconel, stainless steel or special alloys) and surface treatments matched to the operating environment. Our engineers can recommend options based on temperature range, media exposure and cycle life.

What documentation can you provide with production orders?

We supply inspection reports, material certificates, dimensional records and traceability documentation as agreed during project setup. PPAP and FAIR packages are available for automotive and aerospace programs.

What is the expected lead time?

Lead time depends on the spring type, material, tooling, quantity and approval requirements. We confirm the production and sample schedule during quotation.

How are payment and delivery terms confirmed?

Commercial terms, delivery address and documentation requirements are confirmed with the quotation before production starts.

What support is available after delivery?

After-delivery questions can be routed through the project contact for drawing questions, quality documents, repeat orders and application feedback.

Can you provide samples before mass production?

Yes. Prototype and pre-production samples can be arranged for dimensional, load and application approval before the full production order proceeds.